Secure Space Construction

Secure envelope construction, shielding, controlled openings, overhead coordination, and a finished conference environment.

01

The challenge

Envelope assemblies, overhead services, openings, and finishes had to be coordinated as connected parts of the secure space rather than isolated trade scopes.

02

The solution

The work brought together general shielding, acoustic treatment, envelope construction, door installation, above-ceiling coordination, and finish integration with progressive verification.

03

The result

A finished conference space supported by coordinated secure-envelope construction and integrated building systems.

Project photography

Secure construction shown at a general, unclassified level.

Plywood-lined envelope construction in progress with installation tools and materials
Reflective shielding installed across walls and overhead building systems
Metal-paneled shielded room with a heavy metal door
Finished controlled opening with a heavy door and surface-mounted electrical services
Reflective shielding coordinated with piping and structure above a suspended ceiling