Skip to content
Metal-paneled shielded room with a heavy metal door

ICD-705 SCIF & SAPF construction

Build it right. Document it clearly. Reach accreditation faster.

ICD-705-adherent SCIF and SAPF construction led by cleared personnel and veteran-led preconstruction, with disciplined control of perimeter walls, STC-rated assemblies, RF and acoustic treatments, penetrations, and accreditation records.

Plywood-lined secure envelope construction in progressReflective shielding installed across walls and overhead systemsFinished conference space with integrated ceiling systemsFinished controlled opening with a heavy doorReflective shielding coordinated above a suspended ceiling
Over 20

Secure facilities delivered

Cleared staff

Secret-cleared personnel on staff

Veteran-led

Preconstruction leadership

Self-performed

Framing, drywall, and painting

SCIF versus SAPF

Different missions and accrediting authorities. One aligned construction baseline.

Both facility types protect sensitive national-security work, but they serve different information frameworks and follow different approval chains.

SCIF

Sensitive Compartmented Information Facility

A SCIF supports the use and discussion of Sensitive Compartmented Information. It is accredited through the responsible Intelligence Community cognizant security authority and its designated accrediting official.

SAPF

Special Access Program Facility

A SAPF supports Special Access Program information. It is accredited through the applicable Department of Defense cognizant authority and designated accrediting official.

The shared standard

Current federal policy aligns SCIF and SAPF construction to the same baseline technical specification. The mission, approval chain, and project-specific requirements still govern each facility; Envision builds to the approved documents issued for that project.

What Envision coordinates

Perimeter walls, rated assemblies, treatments, and every controlled penetration.

Secure performance is created at interfaces. Cleared personnel and veteran-led preconstruction organize designers, specialists, trades, inspectors, and owner stakeholders around one controlled plan.

  • Perimeter walls and secure-envelope continuity
  • STC-rated assemblies and acoustic treatments
  • RF treatments and specialist coordination
  • Penetration control through the secure perimeter
  • Inspection planning, testing support, and accreditation-ready documentation

ICD-705 in construction

The standard is not a finish-line checklist. It shapes the work from the first detail.

Intelligence Community Directive 705 establishes the policy framework for protecting Sensitive Compartmented Information in accredited facilities. Its associated technical specifications translate that objective into physical and technical requirements. The exact criteria are established by the approved project documents and cognizant authority; Envision’s responsibility is to understand them, coordinate them, and make the installed result verifiable.

01

Construction continuity

Floors, walls, ceilings, structural interfaces, joints, and transitions must form the approved protective envelope without unplanned gaps or substitutions.

02

Acoustic performance

Rated assemblies depend on continuity through doors, seals, ducts, ceilings, joints, and penetrations—not only the nominal wall construction.

03

Perimeter control

Every mechanical, electrical, fire-protection, communications, and structural crossing is located, detailed, approved, inspected, and recorded.

04

Doors & hardware

Frames, leaves, thresholds, seals, locks, monitoring, power, egress, and surrounding construction must satisfy the opening’s combined requirements.

05

Inspection & accreditation

Submittals, progressive inspections, concealed-work evidence, tests, deficiency closure, and as-builts create a traceable record for the owner and accrediting official.

The build process

Plan the perimeter. Control every interface. Preserve the evidence.

The accreditation path is considered from the first review—not introduced after construction is complete.

01

ICD-705 criteria alignment

We review the approved security criteria, accreditation path, site conditions, and responsibilities with the owner, security team, accrediting stakeholders, and designers.

02

Design and constructability review

The team traces the secure perimeter and coordinates walls, structure, doors, ducts, conduit, power, data, life safety, and maintainable access before work is released.

03

Material and inspection readiness

Secure components, approved materials, submittals, installation sequencing, access procedures, and inspection hold points are confirmed before affected work begins.

04

Controlled construction

Qualified supervision manages trade interfaces, workmanship, access, concealed-condition records, and progressive quality checks throughout the build.

05

Testing and correction

We coordinate required acoustic, shielding, alarm, and related verification activities, then drive deficiencies to documented resolution.

06

Accreditation support

Complete as-builts, product records, inspection evidence, test results, and turnover packages support the owner and accrediting official’s final review.

Technical requirements

Performance is only as strong as the least coordinated detail.

Requirements vary by project and cognizant authority. The following describes the coordination disciplines at a general, unclassified level.

Acoustic performance

Specified sound-isolation performance is achieved through complete assemblies. Wall and ceiling continuity, doors, seals, duct paths, conduit, joints, and penetrations all affect the result; project criteria establish required ratings and field verification.

RF & TEMPEST considerations

Where required by the approved criteria, shielding and countermeasures must be treated as continuous systems. Specialist design, seams, grounding interfaces, penetrations, inspection, and testing are coordinated without exposing sensitive details.

Structural & utility penetrations

Every crossing of the secure perimeter is a planned interface. Structure, mechanical, electrical, communications, fire protection, and plumbing penetrations are detailed, approved, sequenced, inspected, and recorded before concealment.

Doors, frames & hardware

Secure openings bring acoustic, physical-security, monitoring, egress, and accessibility requirements together. Frames, thresholds, seals, hardware, power, controls, and adjacent assemblies must operate as one tested opening.

Alarm & access-control coordination

Intrusion detection, access control, door position, power, communications, and life-safety systems require clear ownership and commissioning boundaries. The installation must preserve the perimeter while supporting approved operation.

Verification & documentation

Submittals, material records, progressive inspections, concealed-work evidence, test results, deficiency closure, and as-built drawings provide the traceability needed for owner and accrediting-official review.

A faster path to accreditation

Accreditation stalls when hidden construction problems surface at the end.

Final review is the wrong time to discover an unapproved material, an undocumented penetration, an incomplete acoustic seal, or an opening that does not perform as a system. Those findings can force destructive investigation, reconstruction, retesting, and another review cycle.

Envision shortens the path by moving verification forward: reviewing the design before release, planning first installations and inspection points, recording work before concealment, and correcting deficiencies while the responsible trade is still mobilized. The accrediting authority alone decides whether a facility is approved; disciplined construction gives that authority a cleaner installation and a clearer record to evaluate.

01

Review before release

Trace the secure perimeter, challenge conflicts, confirm responsibilities, and resolve ambiguous interfaces before they become field conditions.

02

Verify first installations

Establish acceptable workmanship at repeated walls, openings, penetrations, and technical interfaces before production accelerates.

03

Inspect before concealment

Give security and quality stakeholders planned access to critical work while it can still be seen and corrected directly.

04

Close deficiencies immediately

Assign every finding, document the correction, and complete required retesting instead of carrying unresolved items into final review.

05

Turn over a coherent record

Organize approved products, inspections, concealed conditions, tests, corrective actions, and as-builts around the accreditation package.

Accreditation support

The accrediting authority decides. The construction record helps them decide with confidence.

Envision does not claim or grant accreditation. We support the owner’s security organization and design team by making the installed work visible, verifiable, and ready for review.

01

Responsive communication

Questions and field conditions are elevated quickly to the people authorized to answer them, with decisions documented for the team.

02

Reliable verification

Inspection points are planned before concealment, and required testing is tied to clear completion and deficiency workflows.

03

Knowledgeable coordination

The team understands how ICD-705 criteria connect across trades and uses that fluency to prevent gaps between separate scopes.

04

Traceable closeout

Approved submittals, inspection evidence, tests, corrective actions, and as-builts are organized for the owner’s review.

Facility security & program questions

Straight answers before secure work begins.

Start a conversation

Bring the secure-construction team in before the perimeter is on paper.